Carmel Tunnels, Haifa (Israel)

Year: 2010

Type of project: Obra Vial

Project outbound: 8 galerías de servicio y 2 edificios de control.

Installed equipment:

10 IRat Electrosonic 1200 units, 10 amplifiers and 600 ultrasonic speakers.

Project Description:

Because of the enormous amount of rodents and after an incident caused by a rat, which, when stood on two copper busbars, causing a fire in an electrical panel room (see photographs), the client decided to install our systems in the most critical sectors of the site.

Since then, no damage has occurred none presence of rodents in the protected areas has been re-verified, presence that is still noticed in the areas where our system is not installed.